STELTON
Estimated 3-month reduced construction schedule.
_format(webp).avif)
No items found.
This is a commercial office building addition with a steel structure.
_format(webp)%20(7).avif)
The main concern for this project was the speed of installation and preparing the façades as quickly as possible. This approach allows the interior trades to accelerate their work accordingly.
_format(webp)%20(8).avif)
_format(webp)%20(9).avif)
STELTON
SZ, SF
8,000 SF
PRODUCT
DWall 1500
CLADDING MATERIAL
Aluminum
,
Brick Slip
,
PROJECT TYPE
Renovation
,
Retail Building
,
LOCATION
Piscataway, NJ
_format(webp)%20(11).avif)
INTERESTING FACTS ABOUT THE PROJECT
This is a non residential project.